{"id":357,"date":"2021-07-16T12:57:33","date_gmt":"2021-07-16T10:57:33","guid":{"rendered":"https:\/\/us.edu.pl\/centra-badawcze\/scw\/?page_id=357"},"modified":"2022-10-09T21:25:24","modified_gmt":"2022-10-09T19:25:24","slug":"badania-zlecone","status":"publish","type":"page","link":"https:\/\/us.edu.pl\/centra-badawcze\/scw\/en\/badania-zlecone\/","title":{"rendered":"commissioned research"},"content":{"rendered":"

[vc_row el_class=”container”][vc_column]\r\n

\r\n
\r\n

Commissioned research<\/h3>\r\n
<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space]\r\n
\r\n
\r\n \r\n

Carried out in the years: 2021<\/strong><\/a> | 2020<\/strong><\/a> | 2019<\/strong><\/a> | 2018<\/strong><\/a> |\u00a02017<\/strong><\/a> | 2016<\/strong><\/a> | 2015<\/strong><\/a> <\/span><\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

2021\u00a0<\/strong><\/span><\/p>\n


\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][vc_column width=”1\/2″][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n

\r\n
\r\n \r\n
<\/p>\n

PAPROCANY RESERVOIR
\nIN TYCHY<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Development of the bathing water profile for the Paprocany reservoir in Tychy (ul. Parkowa 17) in accordance with the Regulation of the Minister of the Environment of November 4, 2019, on water profile in bathing water with functional analysis with regard to flood protection, small retention, and recreation – Tychy Municipality – 2017, 2018, and 2021.<\/p>\n

As part of the orders, a bathing water profile was prepared and updated. Moreover, an analysis was performed taking into account flood protection aspects, functions related to small water retention, and recreational functions of the reservoir.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column]\r\n

\r\n
\r\n \r\n

Bathing area on the Paprocany reservoir in Tychy<\/span><\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[vc_row_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"zbiornik
\nphoto by Bartosz \u0141ozowski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"zbiornik
\nphoto by Bartosz \u0141ozowski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

2020\u00a0<\/strong><\/span><\/p>\n


\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][vc_column width=”1\/2″][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n

\r\n
\r\n \r\n
<\/p>\n

RESERVOIR IN KOLBARK-KOBYLICA
\nKLUCZE MUNICIPALITY<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Preliminary analysis of the possibilities and assumptions of the concept for the construction of the planned reservoir in Kolbark-Kobylica on the Bia\u0142a Przemsza River in the Klucze Municipality with a functional analysis with regard to flood protection, small retention, and recreation – Klucze Municipality – 2020.<\/p>\n

The subject of the commissioned work was a preliminary analysis of the possibilities and assumptions of the concept for the construction of the planned reservoir in Kolbark-Kobylica on the Bia\u0142a Przemsza River in the Klucze Municipality with a functional analysis with regard to flood protection, small retention, and recreation (Klucze Municipality, Olkusz Poviat) on 56.8 km of the river Bia\u0142a Przemsza. Using knowledge-based spatial modelling tools, flood and recreational functions were verified and retention capacity was determined. The effects of the investment were assessed by analysing the changes in the value of ecosystem services provided by the environment and the planned reservoir. It was indicated that the reservoir has a positive influence on local ecosystems, performs an important role in limiting the effects of progressive climate change, increases biodiversity, secures water supply for economic and fire fighting purposes in the municipality. The benefits for the inhabitants of the region, who gain attractive places for recreation, were also indicated. The proposed location of the reservoir was introduced into the spatial development plans of the Klucze Municipality. The next stages of the investment are implemented on the basis of the research performed by the SWC.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row][vc_column]

<\/div><\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n
\r\n
\r\n \r\n
<\/p>\n

SOSINA RESERVOIR
\nIN JAWORZNO
\n<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Performing sonargraphic bathymetric measurements, preparing a bathymetric map of the Sosina reservoir in Jaworzno, and confirming the code of dredged spoil from the removal of sediment from the bottom of the Sosina reservoir in Jaworzno for the implementation of the task entitled \u201dReclamation and expansion of the tourist infrastructure of the Sosina reservoir in Jaworzno\u201d – Municipality of the City of Jaworzno – 2020<\/p>\n

As part of the commissioned work, bathymetric measurements were made and on their basis, the parameters of the reservoir depth were determined and a 3D reconstruction of the Sosina reservoir bowl (bathymetric map) was performed.<\/p>\n

On the basis of the provided laboratory test results, the dredged spoil code was confirmed, indicating that the spoil from the removal of sediment from the Sosina reservoir meets the legal requirements in accordance with the applicable legal acts.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column]\r\n

\r\n
\r\n \r\n

The launch of the U\u015aka II boat on the Sosina reservoir in Jaworzno and bathymetric measurements on the Sosina reservoir in Jaworzno<\/span><\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[vc_row_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"wodowanie
\nphoto by Bartosz \u0141ozowski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"zbiornik
\nphoto by Bartosz \u0141ozowski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

2019\u00a0<\/strong><\/span><\/p>\n


\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][vc_column width=”1\/2″][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n

\r\n
\r\n \r\n
<\/p>\n

POND 24 BRANDKA, WS-47 B\u0104CZEK
\nBYTOM<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Qualitative research on an interior basin – Staw 24 Brandka, Ws-47 B\u0105czek in Bytom – Bytom Municipality – 2019.<\/p>\n

The subject of the report was the assessment of the condition of the Staw 24 Brandka reservoir, Ws-47 B\u0105czek in Bytom and a preliminary review of the hazards in its catchment area in terms of the specification of essential terms of contract for the modernisation of the interior basin.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column]\r\n

\r\n
\r\n \r\n

Pomiary batymetryczne oraz przygotowanie sprz\u0119tu pomiarowego na zbiorniku Brandka w Bytomiu
\n<\/span><\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[vc_row_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"naukowcy
\nphoto by Bartosz \u0141ozowski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"ponton
\nphoto by Bartosz \u0141ozowski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column]

<\/div><\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n
\r\n
\r\n \r\n
<\/p>\n

INDUSTRIAL WATERS OF THE NURSERY FARM “KR\u00d3L\u00d3WKA”
\nKOBI\u00d3R<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Analysis of the quality of industrial water of the Nursery Farm “Kr\u00f3l\u00f3wka” in Kobi\u00f3r in terms of dwarfing of seedlings – \u201dState Forests\u201d National Forest Holding Forest Inspectorate Kobi\u00f3r – 2019<\/p>\n

The aim of the study was to analyse the quality of water from two own deep wells of the Nursery Farm, used in the “Kr\u00f3l\u00f3wka” forestry container nursery for watering seedlings. On the basis of the analyses, the cause of the dwarfing of seedlings was indicated and corrective measures were proposed.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_row_inner content_placement=”top”][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"dwa
\nPolystyrene (1) and polyolefin (2) containers for the production of seedlings in container nurseries
\nphoto by Marcin Libera<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"dwa
\nRetention reservoirs for industrial water with a capacity of about 30 m3<\/sup>
\nphoto by Marcin Libera<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column]

<\/div><\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n
\r\n
\r\n \r\n
<\/p>\n

POGORIA III RESERVOIR
\nD\u0104BROWA G\u00d3RNICZA MUNICIPALITY<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Analysis of the condition and development of recommendations for the management of the Pogoria III water reservoir – D\u0105browa G\u00f3rnicza Municipality – 2019.<\/p>\n

The subject of the study was the assessment of the condition of the Pogoria III reservoir made on the basis of research, field study, and laboratory analyses. The works were undertaken in order to diagnose the causes of the deteriorating water quality in the reservoir as indicated by the results of measurements conducted by the Provincial Environmental Protection Inspectorate in Katowice for the bathing beach, according to the information obtained from the Principal. The research included bathymetric and physicochemical measurements made from the surface of the reservoir with the use of floating equipment and a review of available historical data. The measurement results reflect the water condition on the measurement day. Understanding the variability of water quality and assessment of the processes taking place in the reservoir will require the analysis of data from at least the full hydrological year, taking into account meteorological conditions such as rainfall, temperature, wind direction, and strength as well as direct anthropogenic factors.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_row_inner content_placement=”top”][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"sze\u015b\u0107
\nImages of the reservoir bottom taken in 2016 (A, C, E) and in 2019 (B, D, F)
\nphoto by Robert Wi\u015bniewski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"cztery
\nThe image of submerged vegetation was recorded in the area of the fishing buoy. A \u2013 buoy on the surface of the water; B \u2013 fields of dead submerged vegetation; C \u2013 decaying plant debris; D \u2013 barren area in a field of submerged vegetation
\nphoto by Robert Wi\u015bniewski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column]

<\/div><\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n
\r\n
\r\n \r\n
<\/p>\n

RESERVOIRS OF THE LEMNA WASTEWATER <\/strong><\/span><\/small>TREATMENT PLANT
\nKOCHCICE<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Analysis of the condition of the resevoirs in the Lemna wastewater treatment plant in Kochcice – Browarski Roman “HYDROTECH” Zak\u0142ad Ochrony \u015arodowiska<\/p>\n

The aim of the research was to determine the model of the reservoir bowl of the wastewater treatment plant in Kochcice, the analysis of the thickness of bottom sediments, and the large-scale analysis of the physicochemical parameters of the waters of these reservoirs. Two water reservoirs of the Lemna 1 and Lemna 2 wastewater treatment plants in Kochcice were analysed. Additionally, selected physicochemical parameters of the waters flowing into the Kochcice stream were analysed with a multi-parameter probe.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_row_inner content_placement=”top”][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"Zanieczyszczenia
\nPhotos of the Kochcice stream outflow from the Ludwik pond, hydrotechnical devices
\nphoto by Marcin Libera<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"Zanieczyszczenia
\nCompost heap
\nphoto by Marcin Libera<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column]

<\/div><\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n
\r\n
\r\n \r\n
<\/p>\n

SEDIMENT FIELD IN CHUCHU\u0141KA HAMLET
\nPSZCZYNA<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Study of the thickness of the sediments deposited in the sediment field located in the hamlet of Chuchu\u0142ka in Pszczyna – G\u00f3rno\u015bl\u0105skie Przedsi\u0119biorstwo Wodoci\u0105g\u00f3w SA in Katowice<\/p>\n

The aim of the study was to determine the degree of terrestrialisation of the sedimentary fields, the Chuchu\u0142ka sedimentation reservoir for technological sediments from the Water Treatment Plant in Gocza\u0142kowice and the forecast time of its complete terrestrialisation.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_row_inner content_placement=”top”][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"Zbiornik
\nArea of Chuchu\u0142ka sedimentation basin free from terrestrialisation
\nphoto by Marcin Libera, Andrzej Wo\u017anica<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"Zbiornik
\nPartially terrestrialised area of Chuchu\u0142ka sedimentation basin
\nphoto by Marcin Libera, Andrzej Wo\u017anica<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column]

<\/div><\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n
\r\n
\r\n \r\n
<\/p>\n

GOCZA\u0141KOWICE RESERVOIR<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Development of a report on the condition of groundwater around the Gocza\u0142kowice Reservoir (“Quantitative Report”), 12 monthly reports to assess the quality of surface waters (“Quality Reports”), and a report on the spatial variability of the waters of the Gocza\u0142kowice Reservoir (“Report on Variability”) – G\u00f3rno\u015bl\u0105skie Przedsi\u0119biorstwo Wodoci\u0105g\u00f3w SA in Katowice – 2019-2020<\/p>\n

Groundwater monitoring was carried out with the use of piezometers of the monitoring network established as part of the ZiZOZap project. Groundwater monitoring included quantitative and qualitative research on groundwater. As part of the qualitative monitoring, chemical composition and quality tests were performed in the scope of the analysis of unstable parameters (temperature, pH, EC, Eh) and in the scope of the most common pollution indicators (nitrogen compounds, phosphates, chlorides, sulphates)..<\/p>\n

The report was prepared on the basis of continuous and patrol monitoring of surface waters. Continuous monitoring sets the trend of modern water quality measurement methodology. Continuous monitoring of the physical and chemical parameters of water allowed to show the dynamics of the observed indicators, not only seasonal but also diurnal.<\/p>\n

A large-scale analysis of the waters of the Gocza\u0142kowice reservoir was carried out, i.e. a physicochemical spatial analysis of the reservoir including the following parameters: temperature, pH, dissolved oxygen, conductivity, turbidity, salinity, and Secchi disc visibility. Statistical analysis of the distribution of parameters in the area of the reservoir using the kriging method and the selection of possible endangered areas was used to prepare a 3D map of the physicochemical variability of the waters of the Gocza\u0142kowice Reservoir.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column]\r\n

\r\n
\r\n \r\n

Measurements of water quality in the Gocza\u0142kowicki Reservoir<\/span><\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[vc_row_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"U\u015aka
\nphoto by Bartosz \u0141ozowski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][vc_column_inner width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

\"Zbiornik
\nphoto by Bartosz \u0141ozowski<\/em><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column]

<\/div><\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n
\r\n
\r\n \r\n
<\/p>\n

PI\u0143CZOWSKI RESERVOIR
\nPI\u0143CZ\u00d3W MUNICIPALITY
\n<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Development of assumptions for the implementation of the project of integrated management of the Pi\u0144cz\u00f3w Reservoir along with the definition of proposed activities for the protection of freshwater mussels living in the reservoir – Pi\u0144cz\u00f3w Municipality<\/p>\n

The development of the report, which is also a proposal of actions for the rational management of the Pi\u0144cz\u00f3w reservoir in order to improve and maintain the water condition and the reservoir water environment, was carried out on the initiative of the mayor of the city of Pi\u0144cz\u00f3w, in connection with the challenges arising from the desire to maintain recreational and natural functions, especially in the context of freshwater mussels living in the reservoir. The report was prepared based on the data collected in the field, the information provided verbally, and materials from the Regional Directorate for Environmental Protection in Kielce, regarding the mass death of freshwater mussels in the Pi\u0144cz\u00f3w Reservoir in 2018. Field studies were carried out to identify hotpoints that may indicate the causes of the extinction of mussels from the Unionidae family. Based on the analyses, it was proposed to conduct a series of studies aimed at creating a reservoir management plan.<\/p>\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/2″]\r\n

\r\n
\r\n \r\n
<\/p>\n

2018\u00a0<\/strong><\/span><\/p>\n


\n

\n<\/div>\r\n <\/div>\r\n <\/div>[\/vc_column][vc_column width=”1\/2″][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column][vc_empty_space height=”16px”][\/vc_column][\/vc_row][vc_row el_class=”container”][vc_column width=”1\/3″]\r\n

\r\n
\r\n \r\n
<\/p>\n

ROGO\u0179NIK I RESERVOIR
\nBOBROWNIKI MUNICIPALITY
\n<\/strong><\/span><\/small><\/p>\n

\n<\/div>\r\n <\/div>\r\n <\/div>[vc_empty_space height=”2px” css=”.vc_custom_1626433488550{background-color: #0070ba !important;}”][\/vc_column][vc_column width=”2\/3″]\r\n

\r\n
\r\n \r\n

Comprehensive analysis of the condition of the Rogo\u017anik I reservoir with the presentation of corrective proposals – 3 stages – Bobrowniki Municipality – 2018<\/p>\n

The scope of the performed research work included:<\/p>\n