A home of our own at last. Building Bankowa 11B
For years, the life of the Faculty centred on ‘Ósemka’ [‘Number Eight’] – its home at Bankowa 8. The building did not belong to the University, however, but to the Lutheran parish. In 1993, a regulatory commission ordered the property to be returned to the parish. The University continued to use the building, but now had to pay rent. Meanwhile, student numbers were rising and the Faculty’s classes and work had to be spread across several buildings. The need for premises of its own was becoming ever more pressing.
At the end of 1996, the design concept for the Faculty’s new home was presented to the public. In a competition, the Faculty’s leadership chose the design by the Stabil studio. The architects worked to a brief prepared at the Faculty, setting out the needs of teaching, the departments, the library and the administration. The semicircular building, compared in the press to the Colosseum in Rome, was to stand between Hotel Warszawa and the Rawa. The move was announced for the 2001/2002 academic year.
The heart of the building was to be a forum, surrounded by lecture theatres and corridors leading to other rooms. The design combined references to old academic models with modern technical solutions. In the finished building, the eye was drawn to the star-patterned granite floor, the spiral staircase and the glazed bridge above the forum, while the heating, air conditioning and lighting were all controlled by computer systems.
The Faculty’s own funds were set aside for the project, including income from fees for part-time studies. In 1996, Dean Genowefa Grabowska reported that the money being saved had been invested in treasury bills. When state subsidies were cut in 2001–2002, the University put in more of its own money and cut other spending to keep the work going.
On 1 October 2003, the University of Silesia’s academic year was inaugurated in the new building. About two-thirds of it had been handed over for use; the rest was still being finished. Rector Janusz Janeczek joked that Dean Kazimierz Zgryzek had been coming here at night with a trowel to speed up the building work.
Second-year law students with maps were waiting for guests. They kept an eye out for anyone who needed help finding their way. Most often they pointed people to the toilets; students were also looking for the dean’s offices – ‘because you can easily get lost in here,’ laughed Basia Jarząb. The first classes in the new building were announced for the coming Saturday.
11.1. A foundation for a new home
In 1994, at the initiative of the academic staff, the Foundation of the Faculty of Law and Administration of the University of Silesia, ‘Facultas Iuridica’, was set up. Each of the founders put in a million old złoty, creating start-up capital of 30 million old złoty. This was before the redenomination of 1995, when 10,000 old złoty became one new złoty, so it was not a fortune, but it had symbolic weight: the staff had decided to create together an institution that would support the development of the Faculty and of Silesia’s legal community.
The Foundation became an additional source of organisational and financial support. It funded research, publications and conferences, as well as prizes and scholarships for outstanding students. One of its aims was also to raise money for building the Faculty’s own premises. Its creation showed that the Faculty was by now building not only its own academic staff but also institutions that would serve its further development.
11.2. What was left in the capsule
On 26 June 2001, a time capsule with a message for the future was walled into the Faculty’s building, then under construction. In it were the foundation act, a special issue of Gazeta Uniwersytecka [the University’s magazine], a CD with information about the University, the minutes and a symbolic one-złoty coin. Those attending the ceremony signed the act and it was walled in by Rector Tadeusz Sławek, Dean Kazimierz Zgryzek and the mayor of Katowice, Piotr Uszok. The building was not yet finished, but people were already choosing what it should preserve from the time of its making.
11.3. The building that water could have pushed out of the ground
Before the new building of the Faculty of Law and Administration rose beside the Rawa, the builders had to contend with a number of water-related issues. The river, fed among other sources by the Katowice coal mine, posed a serious threat to the project.
As site manager Julian Kiełbasa recalls, expert reports showed that the chemical composition of the water could destroy concrete piles. It meant an unusual solution had to be chosen: strengthening the ground with gravel columns. These columns, placed beneath the building, have a combined length of about 10 kilometres.
The hardest part, however, was controlling the water flowing in. The pumps ran without a break until the first floor was finished. Switching them off any sooner risked the water pressure actually pushing the rising structure upwards. Only when the building was heavy enough to resist could the pumping stop.
